Do you have a separate sensor to control the temp or just the built-in thermostat? If you have a separate sensor I would recommend placing it against the side of your fermenter, covering it with an insulator (bubble wrap, cloth, shelf liner) and then tape the insulation into place. If not, a variation of Deezil's advice sounds good to me...start at 65F, as soon as you see active signs of fermentation drop the temp 2-3° every 8-12 hours until the ambient temp is in the mid to upper 50s, then after five days (or when you rack to secondary, whichever comes first) increase the temp back up to 65F. The ramp down is to help prevent causing the yeast to go dormant from the temp change. The temp increase at the end is to ensure that the yeast finish their job.