- Joined
- Jun 23, 2019
- Messages
- 57
- Reaction score
- 79
Hello Folks,
I'm working on my first actual Kit. It's an RQ Cab Sav kit. I'm pretty much ready for stage 2 which is rack to carboy at 1.020 until below .998. Step 3 mentions racking and attaching a bung and airlock, but step 2 doesn't mention the airlock. Am I correct in assuming that I just put a towel over the spout for stage 2? Or should I be using the airlock in this step as well?
Thanks,
Jay
I'm working on my first actual Kit. It's an RQ Cab Sav kit. I'm pretty much ready for stage 2 which is rack to carboy at 1.020 until below .998. Step 3 mentions racking and attaching a bung and airlock, but step 2 doesn't mention the airlock. Am I correct in assuming that I just put a towel over the spout for stage 2? Or should I be using the airlock in this step as well?
Thanks,
Jay