10 inches out the back door, 12 out the front as of 8 am. Supposed to end by Noon. Since wifey was still in training she didn't have to stay overnight in a nearby hotel, so we all just slept in. Making 2 lbs of thick cut bacon, some eggs, toast and french toast on ho-made bread. We'll all start taking shifts on the 200 ft driveway, hoping to get most of it cleared before the high winds hit, though if we wait some will be cleared by the wind, the issue is with the pile that will form at the bottom of the driveway. Everyone be safe!