The wine room will finally be taking a big step on Thursday. All inspections are complete and passed, and all systems operational. I've only run the refrigeration for a short time to test, but it sure pumps some cold air and is barely audible.
On Thursday, everything gets closed cell spray foam, underside of the roof, ceiling joists and walls, my refrigerated box will finally take its biggest step. All fiberglass insulation removed, piping and wiring in the walls I are secured, stub outs for LED lighting made, thermostat wire stubbed out, all receptacle and switch boxes sealed with tape.
This weekend I'll be installing MR drywall, taping, floating, and hopefully getting the walls primed. Ambitiously, I'd love to get the first coat of paint on, but that's a stretch.
Next week we'll start the mud bed for the slate flooring.